Champfleury Extension (Aube)
| Department | 10 (Aube) |
|---|---|
| Commissioning | 2010 |
| Installation | 13x MM92/ 80m (2MW - REpower) |
| Total power output | 26MW |
| BOP contractor | CEGELEC |
| Department | 10 (Aube) |
|---|---|
| Commissioning | 2010 |
| Installation | 13x MM92/ 80m (2MW - REpower) |
| Total power output | 26MW |
| BOP contractor | CEGELEC |